Intel Xeon 7 Diamond Rapids reportedly delayed to mid-2027, followed by Coral Rapids in 2028

A delay to Diamond Rapids creates a gap in Intel's roadmap, forcing it to rely on Clearwater Forest and Granite Rapids to maintain its server foothold.

Intel Xeon 7 Diamond Rapids reportedly delayed to mid-2027, followed by Coral Rapids in 2028
Comment IconFacebook IconX IconReddit Icon
Tech Reporter
Published
2 minutes & 15 seconds read time
TL;DR: Intel plans to launch its Xeon 6+ "Clearwater Forest" E-core CPUs in early 2026, featuring up to 288 cores with Foveros 3D packaging and high memory bandwidth. The 16-channel Diamond Rapids P-core Xeons are delayed to mid-2027, while SMT returns with Coral Rapids in 2028, amid competitive pressure from AMD.
0:00 / 0:00

Hardware enthusiast Jaykihn has laid out several key details regarding Intel's Datacenter and AI roadmap for the next few generations. Intel's Xeon 6+ "Clearwater Forest" (CFW), the highly anticipated E-core-only family, is on track for launch in the first half of 2026. First previewed at Hot Chips 2025, these CPUs can support up to 288 energy-efficient E-cores based on the Darkmont architecture, delivering high parallel performance for server workloads.

To achieve this massive density, Intel is using Foveros 3D packaging, which stacks 12 compute chiplets on three active base tiles and two I/O tiles. The CFW family remains compatible with current Xeon sockets and introduces higher memory bandwidth, supporting 12-channel DDR5-8000 memory.

On the P-core side, Granite Rapids will remain in production for at least another year, as Intel has pushed back the 16-channel Xeon 7 Diamond Rapids (DMR) to mid-2027. Last year, Intel decided to axe the 8-channel versions of the chip, fully committing to the high-end enthusiast and enterprise market.

While details remain scarce, Intel builds the compute tiles on Diamond Rapids using its 18A process. Intel reportedly uses the updated Panther Cove-X architecture, a server-optimized variant of Coyote Cove set for Nova Lake. While early rumors pointed to a 192 P-core ceiling, Jaykihn now hints at a massive 512-core variant arriving a quarter or two after the initial 16-channel launch. We're not sure if this specific number refers to a multisocketed configuration, but time will tell.

The exact cause of the delay remains a mystery, but the timing couldn't be worse. AMD plans to launch "Venice" (Zen 6) later this year on TSMC's N2 process, potentially giving Team Red a massive head start. If Intel can't bring Diamond Rapids to market sooner, the delay could disrupt Intel's DCAI earnings and dent critical 18A profit margins, especially as Intel Foundry works to convert its 18A pipeline into consistent external revenue.

Intel Xeon 7 Diamond Rapids reportedly delayed to mid-2027, followed by Coral Rapids in 2028 2

Under the leadership of CEO Lip-Bu Tan, Intel is doubling down on a philosophy that includes a return to SMT (Hyper-Threading). This return to multithreading is expected to debut with "Coral Rapids", which, per the leak, is slated for mid-2028 and is set to serve as the successor to Diamond Rapids.

The specifics of these CPUs are anyone's best guess. The one-year cadence between Diamond Rapids and Coral Rapids remains ambitious, but only if Coral Rapids avoids delays. Intel's Q1 2026 earnings call yesterday did not mention the reported slip at Diamond Rapids. In fact, Intel shares rose 20% in after-hours trading after a massive beat in the DCAI segment.

A prolonged delay in Diamond Rapids could give AMD a window to strengthen its foothold in the data center market. While we should take these rumors with a grain of salt, we expect Intel to clarify its long-term server strategy at upcoming events later in the year.

Photo of the Intel Core Ultra 9 285K
Best Deals: Intel Core Ultra 9 285K
Today7 days ago30 days ago
$544.94 USD$557 USD
--
--
£479.50-
$544.94 USD$557 USD
Check PriceCheck Price
* Prices last scanned 4/25/2026 at 4:33 am CDT - prices may be inaccurate. As an Amazon Associate, we earn from qualifying purchases. We earn affiliate commission from any Newegg or PCCG sales.
News Source:x.com

Tech Reporter

Email IconX IconLinkedIn Icon

Hassam is a veteran tech journalist and editor with over eight years of experience embedded in the consumer electronics industry. His obsession with hardware began with childhood experiments involving semiconductors, a curiosity that evolved into a career dedicated to deconstructing the complex silicon that powers our world. From benchmarking PC internals to stress-testing flagship CPUs and GPUs, Hassam specializes in translating high-level engineering into deep, unbiased insights for the enthusiast community.

Follow TweakTown on Google News
Newsletter Subscription