Technology content trusted in North America and globally since 1999
8,194 Reviews & Articles | 62,004 News Posts

RumorTT: iOS 7 is running behind schedule, will have a "significant system-wide UI overhaul"

RumorTT: iOS 7 is behidn schedule, but it'll be bringing a much-needed UI refresh with it
By: Anthony Garreffa | Operating Systems News | Posted: Apr 3, 2013 6:33 am

During a Branch chat, Daring Fireball's John Gruber has said that iOS 7 is running behind schedule, and that when it is released it'll include a big change to the user interface (UI). He said:

 

rumortt_ios_7_is_running_behind_schedule_will_have_a_significant_system_wide_ui_overhaul_02

 

What I've heard: iOS 7 is running behind, and engineers have been pulled from OS X 10.9 to work on it. (Let me know if you've heard this song before.)

 

Gruber also noted that iOS 7 is set to have a "significant system-wide UI overhaul" and that iOS engineers who are toting the next-gen mobile OS from Apple are required to have a special privacy filter on their devices that reportedly limits viewing angles on their devices. This stops others from getting a look at the new-look iOS.

 

iOS has needed an UI overhaul for a while now, something I've been itching for since the iPhone 3GS. Android has been making strides in the UI department, something Apple should've been on the ball about. iOS 7 should hopefully be quite striking to both look at, and use.

NEWS SOURCES:Macrumors.com

Related Tags

Got an opinion on this news? Post a comment below!
loading